Follow us :

Light steel villa new environmentally friendly removable, let you live in a dream!

Light steel villa new environmentally friendly removable, let you live in a dream!
Light steel villa new environmentally friendly removable, let you live in a dream!Light steel villa new environmentally friendly removable, let you live in a dream!Light steel villa new environmentally friendly removable, let you live in a dream!Light steel villa new environmentally friendly removable, let you live in a dream!Light steel villa new environmentally friendly removable, let you live in a dream!
group name
Light Steel Villa
Min Order
1 piece
brand name
FXGTSS
model
FXGTSS
Nearest port for product export
Dalian,China
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW, FCA
Acceptable payment methods
T/T, L/C, Westem Union, Cash
update time
Wed, 03 Mar 2021 15:52:28 GMT

Paramtents

  • Color Custom made

  • Weight Custom made

Packging & Delivery

  • Min Order1 piece

Briefing

The steel frame structure is assembled by steel plate cutting and welding.

Detailed

Light Steel Villa
Brand : Dalian Fuxin guangsheng trade Co,Ltd. FXGTSS
Material : Q345B
Specification : Custom
Roof load value : 1KN / M2
Shock resistance : Level 7
Surface treatment : Sand blasting, rust removal Sad3
Anticorrosion treatment : Paint epoxy primer, polyurethane topcoat
Coating thickness : >65μm> 100μm
Use : As villas, family houses, labor sites, schools, restaurants, hotels, offices, shops, temporary exhibitions, containers and other places.
Features :
(1) The production of light steel structure parts for light steel villas is highly industrialized and mechanized, with a high degree of commercialization.
(2) The on-site construction speed of the light steel villa is fast, mainly for dry operation, which is conducive to civilized construction.
(3) The steel structure of the light steel villa is an environmentally sustainable product.
(4) Light steel villa has light weight and good seismic performance.
(5) Because the thickness of the light steel structure is small, the light steel villa can increase the effective use area compared with the brick-concrete structure;
Installation method : On-site hoisting assembly, bolt connection installation
Delivery time :
10 tons: 15-20 days
11 tons-50 tons: 35-50 days
Payment method : TT, T / T