High quality steel column and beam for platform connection column and equipment platform

High quality steel column and beam for platform connection column and equipment platform
High quality steel column and beam for platform connection column and equipment platformHigh quality steel column and beam for platform connection column and equipment platformHigh quality steel column and beam for platform connection column and equipment platformHigh quality steel column and beam for platform connection column and equipment platformHigh quality steel column and beam for platform connection column and equipment platform
group name
Steel structure parts
Min Order
1 piece
brand name
FXGTSS
model
FXGTSS
Nearest port for product export
Dalian,China
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW, FCA
Acceptable payment methods
T/T, L/C, Westem Union, Cash
update time
Thu, 01 Apr 2021 15:37:24 GMT

Paramtents

  • Color Custom

  • Weight Custom

Packging & Delivery

  • Min Order1 piece

Briefing

Steel column and beam for platform connection column and equipment platform

Detailed

Steel column and beam
Product name: steel column and beam
Brand:Dalian Fuxin guangsheng trade Co.,Ltd.    FXGTSS
Material:Q235B
Span/Height:Customization
Roof load value:1.0KN/M
Shockproof intensity:Level 7
 Surface Treatment:Sandblasting,derusting Sad3
Antiseptic Treatment:Paint epoxy primer,polyurethane finish
Coating Thickness:Greater than 65um,greater than 100um
Use:1. Platform connection column and equipment platform.
        2. Can be used for the construction of canopy, bus station, subway station, parking lot, stadium, factory site.
Characteristic:
1. Light weight, large strength and large span.
2. Practical, strong earthquake resistance, strong wind pressure.
3. Easy to move, clean recycling, good environmental protection
4. Short construction period, reduce investment cost accordingly.
5. Good stability and carrying capacity.
Installation Mode:Site hoisting assembly, bolt connection and installation
Delivery Time:
10 tons :15-20 days;
10-200 tons of 35 to 50 days
Payment Method:TT,T/T