2. When the steel structure platform is making holes, the accuracy and allowable deviation of the bolt holes should meet the specifications. When the allowable deviation of the bolt holes exceeds the specifications, the welding rod that matches the material of the base material should be used for repairing and re-making the holes; Before assembling, the parts and components should be inspected and qualified; the assembly of components should be carried out after the parts are assembled and welding correction, and the assembly sequence should be determined according to factors such as structural form, welding method and welding sequence.
3. When welding the steel structure platform, it is necessary to perform welding procedure qualification for the steel material, welding material, welding method, post-weld heat treatment, etc. used for the first time, and the welding procedure should be determined according to the qualification report; Welding rods with rusty cores, damp and agglomerated fluxes, and welded shells. Welding wire and welding nails should be cleaned of oil and rust before use. When welding, the welder should follow the welding procedure. After the welding is completed, the welder should clean up the slag and spatter on both sides of the weld surface, check the appearance quality of the weld, and after passing the inspection, place the welder's steel stamp on the weld and parts specified in the process.
4. The steel structure platform should be derusted before painting. The painting should be even without obvious wrinkles or sagging. The adhesion should be good. After painting, the original number of the component should be marked on the component, and the large component should be marked Weight, center position and positioning mark.
Dalian Fuxin Guangsheng Trading Co., Ltd. was established in June 2017 and has independent import and export rights. The company's business scope: import and export of goods and technology. The business address is Guangningsi Community, Ershilipao Street, Dalian Free Trade Zone, with 9 business employees. Since the establishment of the company, the export business of steel structure products from Singapore, Japan and Germany has been continuously carried out. Completion of foreign exchange settlement transactions for Singapore dollars, Japanese yen and US dollars.
The company adheres to the concept of "integrity and pragmatism, innovation and win-win, satisfactory service, and the most excellence". Based on a brand-new management model, perfect technical business, thoughtful service, and excellent quality, the company continues to provide quality services and continuously improve management. Insist on customer first, do our best to provide customers with satisfactory products and considerate services, pursue win-win and common development with customers, and strive to build a sustainable and outstanding enterprise.