How to ensure the quality of steel structure products?

With the development of the economy, more and more customers choose to make steel structure workshops. The proportion of steel structure workshops in the entire plant project is constantly rising. Judging from the current development situation, steel structure workshops will become the mainstream of the plant in the future select. Although the steel structure workshop is good, this "good" is also based on careful construction. It can be seen from this that it is very necessary to improve the safety factor of the steel structure workshop and ensure the quality of the steel structure workshop. So how to ensure the quality requirements of steel structure products? The following are the issues that need to be paid attention to in the production and installation of steel structure workshops:

Design is the source of all processes, and reasonable design is only possible to build a safe and reliable steel structure factory. Designers should take into consideration the plant span, the specifications of the materials to be used, and the load of various materials. Designed to the standards of the steel structure industry.

2. Factory production
1) Lofting and blanking process. This process is the leader before processing, and its quality has a direct impact on the next process, and also directly affects the quality of plant construction materials, etc., so it must be done well in this regard, not to be lost. A
2) Assembly process. This process also has a great influence on the quality of the steel structure workshop, and under such influence, monitoring is also very important, so relevant attention should be paid.
3) Welding process. Since the construction of the steel structure workshop is mainly spliced ​​by welding steel members, the quality of the welding quality directly determines the quality of the steel structure workshop. And this is also the most prone process of quality problems, which affects the quality and safety of steel structure workshops. Therefore, great attention should also be paid to the construction of this project.
4) Painting process. This process is a relatively hidden work in the construction of steel structure workshops. The impact on the structure is less than the impact on the building function, but it is also a process that is more prone to quality problems. Therefore, this is also a factor that affects the quality of steel structure workshops.

3. On-site installation
On-site installation must first make a good foundation, and secondly standardize the operation and control the accuracy of hoisting. The important point is the quality of assembly and welding. I believe that through the control of the above procedures, we will be able to successfully build a safe and stable plant.
   
Dalian Fuxin Guangsheng Trading Company is a company specializing in the design and manufacture of steel structures and non-standard metal parts. It was established in June 2017 and has independent import and export rights. With dozens of advanced processing and testing equipment, company leaders and employees always put product quality in the first place, adhere to the "high standard, zero defect" production quality concept, and bring the most sincere service to customers with sincerity. Quality is not only the quality of products, but also the perseverance and soul of Guangtong Steel Structure. Fuxin Guangsheng practices corporate responsibility and social responsibility, and incorporates the "quality concept" into all products manufactured. Strict manufacturing standards and quality control control cast the highest quality of Fuxin Guangsheng products.